ADEWAAbu Dhabi Water and Electricity Authority (ADEWA) published on April 26th the pre-qualification list for the 350 MW Solar PV plant in Sweihan, 125 km east of Abu Dhabi.  The list includes 34 companies grouped in three different categories.  Eight companies have been pre-qualified on a sole stand-alone basis and are free to submit a proposal without the need to form or join a consortium.  The remaining 26 companies have been Pre-qualified on a conditional basis. The bids will need to be submitted before September 19th, 2016.  Read more